Use this gravel calculator to answer “how much gravel do I need” in tons, cubic yards and bags. Choose a rectangle, circle, triangle or known area, enter the depth, and pick a material preset or your supplier’s own density. The estimate adds an editable compaction allowance, shows US tons and metric tonnes, and prices bulk or bagged stone when you enter rates.

Estimate your materials
ftEnter 0 or more.
ftEnter 0 or more.
ftEnter 0 or more.
ftEnter 0 or more.
ftEnter 0 or more.
sq ftEnter 0 or more.
inEnter 0 or more.
tons/yd³Enter 0–3.
Allowance, bag size & prices
%Enter 0–100.
cu ftEnter 0.01 or more.
Enter 0 or more.
Enter 0 or more.

Gravel to order

4.62tons

  • Area324 sq ft
  • Volume before allowance3 yd³
  • Compaction/settling allowance (10%)+0.3 yd³
  • Volume to order3.3 yd³ (89.1 cu ft)
  • Density used (approximate)1.4 tons/yd³
  • Weight in metric tonnes4.19 t
  • Bags (0.5 cu ft each)179 bags

Updated .

How much gravel do I need?

Work out the plan area, multiply by the depth to get a volume, then multiply the volume by the material’s density to get the weight most yards sell by:

area: rectangle = length × width; circle = π × diameter² ÷ 4; triangle = base × height ÷ 2
cubic yards = sq ft × depth in ÷ 324
order volume = cubic yards × (1 + allowance ÷ 100)
tons = order volume × density (tons per yd³)
bags = ceil(order volume × 27 ÷ cu ft per bag)

In metric the volume is m² × depth in cm ÷ 100, giving cubic meters, and tonnes = m³ × density in t/m³. The calculator converts internally, so the two unit systems give the same physical answer.

Density is the weak link. The Federal Highway Administration measured No. 57 stone at 95.4 lb/ft³ in its loosest state and 108.7 lb/ft³ vibrated to its densest, which works out to 1.29–1.47 tons per cubic yard. Suppliers usually quote crushed stone at 1.35–1.5, and this page defaults to 1.4. The other presets are approximate typical supplier figures; rock type, grading and moisture move them. If your yard publishes its own conversion, pick “Custom density” and enter it.

“Tons” here means US short tons of 2,000 lb. A metric tonne is 1,000 kg, or 1.102 short tons, and 1 ton per cubic yard equals 1.187 t/m³. Both weights appear in the result so you can match whichever unit the quote uses.

Worked example: a 27 × 12 ft parking pad, 3 inches of #57 stone

These are the calculator’s default inputs: a rectangular pad, 3 inches deep, #57 crushed stone at 1.4 tons per yard, the default 10% allowance and 0.5 cu ft bags.

  1. Area: 27 × 12 = 324 sq ft.
  2. Volume: 324 × 3 ÷ 324 = 3 yd³.
  3. Allowance: 3 × 10% = 0.3 yd³, so order 3.3 yd³ (89.1 cu ft).
  4. Weight: 3.3 × 1.4 = 4.62 tons, or 4.19 metric tonnes.
  5. Bags: 89.1 ÷ 0.5 = 178.2, rounded up to 179 bags.

Run the same pad through the 1.35–1.5 density range and the weight moves from 4.46 to 4.95 tons. If the yard sells in whole tons, 5 tons covers the whole range. At 1.4 tons per yard each half-cubic-foot bag holds about 52 lb of stone, so 179 bags means lifting more than four tons by hand. Bags make sense for a path or a top-up of a few dozen; a pad this size is a bulk delivery.

Gravel coverage per ton at common depths

Use this to sanity-check a quote or size a small job without the form. Coverage is geometric, with no allowance, for #57 crushed stone at about 1.4 tons per yard and dense-graded road base at about 1.6. Both densities are approximate.

Tons per 100 sq ft, square feet covered per ton, and 0.5 cu ft bags per 100 sq ft, before allowance.
Depth (in)Tons per 100 sq ft (#57, 1.4)Sq ft per ton (#57, 1.4)Sq ft per ton (road base, 1.6)0.5 cu ft bags per 100 sq ft
10.4323120317
20.8611610134
31.30776750
41.73585167
62.593934100
83.462925134
125.191917200

Coverage per ton falls in proportion to depth: double the depth and a ton covers half the area. Heavier material also covers less per ton, which is why the road-base column runs about 12% below the #57 column at every depth. A ton of lava rock, at roughly half the density of crushed stone, covers about twice the area.

Recommended gravel depths by project

These are commonly cited starting ranges, not an engineered design. Soft clay, poor drainage and heavy vehicles all push toward the deep end.

Typical finished depths by project
ProjectTypical depthNotes
Garden path, stepping-stone infill2–3 inPea gravel or ⅜ in stone over landscape fabric; edging keeps it in place.
Decorative bed or river rock border2–3 inDeep enough to hide the fabric; larger rock needs more depth to cover gaps.
Gravel patio or fire-pit area3–4 in top over 4 in compacted baseCalculate the base and surface as separate layers.
Driveway8–12 in totalBase 4–6 in of crusher run or 1½–2 in stone, middle 3–4 in of #57, top about 2 in of smaller crushed stone.
Shed pad or slab sub-base4–6 in compactedCrusher run or #57, compacted in lifts before forming.
French drainTrench depthClean washed stone around perforated pipe; use the trench’s length, width and stone depth.

Each layer is a separate run of the calculator because each has its own depth and density. A 10 × 60 ft driveway with 4 inches of road base at 1.6, 3 inches of #57 and 2 inches of crushed top stone at 1.4, each with 10% allowance, needs 13.04 + 8.56 + 5.70 = 27.3 tons. Ordering one blended number would get the mix of stone wrong even if the total weight were right.

Loose vs. compacted volume, and setting the allowance

The depth you enter is the finished depth, but stone arrives loose. Dense-graded material such as crusher run, DGA or road base contains fines that pack into the voids, so it loses a lot of thickness under a roller. Penn State’s Center for Dirt and Gravel Roads places its driving-surface aggregate 8 inches loose to finish at 6 inches compacted, or 6 to 4½. That is a third more loose material than the finished depth, and its ordering rule of 0.04 tons per square foot at 8 inches loose implies about 1.6 tons per loose cubic yard.

The default 10% suits a base you will compact with a rented plate compactor, or clean stone such as #57 that settles into place. For road base compacted hard, raise it toward 20–33%, or enter the loose depth and set the allowance to a few percent. Loose decorative gravel that is only raked, such as pea gravel or river rock, barely changes: 0–5% covers uneven ground and spillage.

Suppliers quote by the ton because their loaders dump onto a truck scale; some quote by the yard, measured by the bucket. Convert one to the other with their density, not someone else’s, and confirm whether a “yard” price is loose or compacted.

Frequently asked questions

How many tons of gravel are in a cubic yard?

For crushed stone such as #57, roughly 1.4 tons, with supplier figures ranging from about 1.35 to 1.5. Dense-graded road base runs higher, near 1.6–1.7, pea gravel and river rock a little lower, and lava rock about half as much. Moisture adds weight, so a wet pile weighs more per yard. Ask the yard which conversion it uses and enter it as a custom density for the closest match.

How many square feet does a ton of gravel cover?

Divide 324 by depth in inches times density. At 1.4 tons per yard, one ton covers about 116 sq ft at 2 inches, 77 sq ft at 3 inches and 58 sq ft at 4 inches. Those figures assume a flat, measured surface and no allowance. Divide your area by the coverage figure, then round up to the supplier’s minimum increment.

How much gravel can a pickup truck carry?

There is no universal number; it depends on the truck. Find the maximum combined weight of occupants and cargo on the placard on the driver’s door pillar, subtract the people riding along, and divide by the density. A cubic yard of #57 stone weighs about 2,800 lb, which exceeds the payload of many light-duty pickups. A heaped bed that looks half empty may already be overloaded.

Is it better to buy gravel in bags or in bulk?

Enter both prices under more options and compare the cost lines. Bags suit small jobs, places a truck cannot reach and projects you carry in stages. For bulk, add the delivery charge and any minimum load before comparing; at 0.5 cu ft per bag, one cubic yard is 54 bags. Check the volume printed on the bag: equal-weight bags of different stones do not hold the same volume.

How do I calculate gravel for a French drain?

Treat the trench as a rectangle: trench length as length, trench width as width, and the depth of stone as depth. Subtract nothing for a 4-inch pipe unless the trench is very narrow; the pipe displaces under 0.1 cu ft per foot. Use clean washed stone such as #57, which drains freely, and keep the allowance low because it barely compacts.

Why is my supplier’s tonnage different from this estimate?

Usually the density. A yard that converts at 1.5 tons per cubic yard will quote 7% more weight than one using 1.4 for the same volume, and both can be honest. Other causes are a different allowance, depth measured before or after compaction, and rounding up to whole or half tons. Ask which density and depth the quote assumes, then enter those figures here.

Sources and assumptions

These results are planning estimates only — verify quantities with your supplier and local building code before you buy or build. See our terms of use.